Initial Power On, Calibration, And Registration (Ac Power Applied) - Cisco DPC3829 User Manual

Docsis 3.0 8x4 wireless residential gateway
Table of Contents

Advertisement

Chapter 3 Operation of Front Panel Indicators
Initial Power On, Calibration, and Registration (AC
Power applied)
The following chart illustrates the sequence of steps and the corresponding
appearance of the residential gateway front panel LED status indicators during
power on, calibration, and registration on the network when AC power is applied to
the residential gateway. Use this chart to troubleshoot the power on, calibration, and
registration process of your residential gateway.
Note: After the residential gateway completes Step 7 (Data Network Registration
Complete), the residential gateway proceeds immediately to Normal Operations. See
Normal Operations (AC Power applied) (on page 25).
Front Panel LED Status Indicators During Initial Pow er On, Calibration, and
Registration
Step:
Front Panel
Indicator
1
POWER
2
DS
3
US
4
ONLINE
5
ETHERNET
1-4
6
2.4G
7
5G
8
WPS
9
MoCA
(Optional)
24
Part 1, High Speed Data Registration
1
2
3
Self
Downstream
Downstream
Test
Scan
Signal Lock
On
On
On
On
Blinking
On
On
Off
Off
On
Off
Off
On
Off, On, or
Off, On, or
Blinking
Blinking
On
On or
On or
Blinking
Blinking
On
On or
On or
Blinking
Blinking
Off
Off or
Off or
Blinking
Blinking
Off
Off, On, or
Off, On, or
Blinking
Blinking
4
5
6
Ranging
Requesting
Request High
IP Address
Speed Data
Provisioning
File
On
On
On
On
On
On
Blinking
On
On
Off
Off
Blinking
Off, On,
Off, On, or
Off, On, or
or
Blinking
Blinking
Blinking
On or
On or
On or Blinking
Blinking
Blinking
On or
On or
On or Blinking
Blinking
Blinking
Off or
Off or
Off or Blinking
Blinking
Blinking
Off, On,
Off, On, or
Off, On, or
or
Blinking
Blinking
Blinking
7
Data
Network
Registration
Complete
On
On
On
On
On
On or
Blinking
On or
Blinking
Off
On
OL-30545-01-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dpc3829m

Table of Contents