Weil-McLain GOLD CGi-4E Manual page 16

Gas-fired water boiler
Table of Contents

Advertisement

CGi-4E Gas-Fired Water Boiler — Boiler Manual
GOLD
3d
Venting — direct exhaust — vent starter
1. Select a vent pipe manufacturer and obtain all vent
components needed, based on boiler location and
venting method.
2. You must use the vent starter made by the vent pipe
manufacturer. See separate
part number of each component, listed by vent
manufacturer.
Figure 8
FasNSeal™
ventstarter
Figure 9
Z-Vent II
vent starter
16
Vent Supplement
Use only the vent starter of the same
manufacturer as the vent compo-
nents. Do not mix components
from different systems. The vent
system could fail, causing flue gas
spillage, resulting in severe personal
injury or death.
3. Follow all applicable national, state, local or provin-
cial codes when venting the CGi-4E boiler.
4. Connect vent starter to blower housing outlet as
shown in the
Figures 8
, for
a. Do not mix components from different vent
manufacturers.
b. Maintain minimum 2" clearance from com-
bustible materials to vent pipe.
c. Seal with sealant specified by vent pipe
manufacturer, using ³⁄₈" bead (not required for
FasNSeal™).
d. Tighten strap at band clamp screw until strap
is snug around blower housing.
Figure 10
Saf-T Vent®
vent starter
Figure 11
StaR-34
vent starter
through
11
.
Part Number 550-110-711/1108

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents