BATTERY RUNDOWN TEST PROCEDURE
Test Requirement:
-Windows 2000/XP
-USB Cable
-ActiveSync 4.2 above (WinCE 6.0 should use ActiveSync 4.5)
-Master Unit
-Battery in Warrantee
Caution:
1、Please charge your unit to full capacity for battery (until the green light
Is displayed) before doing the test.
2、Disable all RF functions including GSM、BT、WLAN、GPS、and etc.
TEST PROCEDURE
IV. Setting and allow USB
connections in Microsoft
ActiveSync.
V.
Connect your device and
desktop/ or laptop via USB cable.
VI.
Check the pop-up message from
Microsoft ActiveSync when
device is synchronized with PC.
HTC confidential
© 2004, HTC CORPORATION. ALL RIGHTS RESERVED.
Connect device to PC
Copy the Battery Rundown tool into the device
TOTAL 53
CONT.ON. 35 PAGE NO. 34