Idle current test
Sleep current test
If current consumption is passed at both of idle and sleep mode, it means M/B is GOOD. If
there is any item FAILED at idle or sleep mode, it means M/B is failed, please replace M/B
for repair.

5.2 Battery rundown test procedure

Test Requirement:
-Windows 2000/XP
-USB Cable
-ActiveSync 4.2 above (WINCE 6.0 should use ActiveSync 4.5)
-Master Unit
-Battery in Warranty
Caution: Please charge your unit to full capacity for battery (until the green light
is displayed) before doing the test.
HTC CONFIDENTIAL
HTC Corporation
.
QUARTZ Service Manual
Issued Date
Revised Date
In "main page", Check phone status,
2.
Click "Turn on flight mode".
Set the unit to :
* Flight mode
* Make sure all RF function is off (phone,
BT, Wifi..)
* Adjust the backlight to lowest.
4. Measure Idle mode current. Idle current
value must under 64mA, if over the
criteria, it means M/B failed, please
replace M/B for repair.
5. After idle current checked, Switch OFF
the unit. Unit is turn off and no display.
Sleep current value must less than 3 mA,
if over the criteria, it means M/B failed,
please replace M/B for repair.
Conclusion:
Doc. No.
DOC-00046130
2008/9/1
2008/12/10
Page
48 of 80