Impex IGS-6201 Owner's Manual page 14

Iron grip strength dual station home gym
Table of Contents

Advertisement

STEP 3
(See Diagram 3)
A.) Attach the Vertical Frame (#7) onto the Main Support Frame (#1). Secure it with two M10 x
2 ¾" Allen Bolts (#97), four
tighten the Nuts and Bolts yet.
B.) Attach the Upper Frame (#17) onto the two Guide Rods (#20) and the Vertical Frame.
C.) Secure the Upper Frame to the two Guide Rods with two M8 x ¾" Allen Bolts (#90) and two
Ø 5/8" Washers (#106). Do not tighten the Bolts yet.
D.) Secure the Upper Frame to the Vertical Frame with two M10 x 3" Allen Bolts (#98), one
Bracket (#2), four Ø ¾" Washers (#107), and two M10 Aircraft Nuts (#110).
E.) Securely tighten all Nuts and Bolts.
¾" Washers (#107), and two M10 Aircraft Nuts (#110). Do not
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents