Drolet EASTWOOD 1500 EPA Owner's Manual page 19

Epa wood stoves
Hide thumbs Also See for EASTWOOD 1500 EPA:
Table of Contents

Advertisement

1- Start by positioning your stove where you would like it to go, taking into account the minimum
clearances to combustible material. You will then be able to determine where the chimney will
pass through the wall. You will probably have to adjust the stove position slightly to ensure
that your chimney will run between the studs. You can use a stud finder to locate the studs.
Use a spoke saw or jig saw to cut a hole, remembering that you need to maintain a clearance
of 2 inches between the chimney and any combustible materials. For concrete walls, cut a
hole slightly larger than the outer diameter of the chimney.
2- Once the opening completed, you need to frame in the area to allow for the installation of a
wall thimble. A wall thimble is not required for installations through concrete walls.
3- You must first secure the wall thimble into the exterior wall surface. Then, do the same inside
and fasten the trim plate.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eastwood 1500Eastwood 1800

Table of Contents