Heat Controller HEV Series Installation, Operation & Maintenance Manual page 32

Residential packaged geothermal heat pump 2 to 5 tons
Hide thumbs Also See for HEV Series:
Table of Contents

Advertisement

Installation, Operation & Maintenance
DXM2 Control Start-up Operation
The control will not operate until all inputs and safety controls
are checked for normal conditions. The compressor will
have a 5 minute anti-short cycle delay at power-up. The fi rst
time after power-up that there is a call for compressor, the
compressor will follow a 5 to 80 second random start delay.
After the random start delay and anti-short cycle delay,
the compressor relay will be energized. On all subsequent
compressor calls, the random start delay is omitted.
Table 7c: Unit Operation
T-stat signal
G
G, Y1
G, Y1, Y2
G, Y1, Y2, W
G, W
G, Y1, O
G, Y1, Y2, O
1
Stage 1 = 1st stage compressor, 1st stage fan operation
Stage 2 = 2nd stage compressor, 2nd stage fan operation
Stage 3 = 2nd stage compressor, auxiliary electric heat, 3rd stage fan operation
2
Stage 1 = 1st stage compressor, 1st stage fan operation, reversing valve
Stage 2 = 2nd stage compressor, 2nd stage fan operation, reversing valve
HEV/H SERIES
DXM2 CONTROLS
Unit
ECM fan
Fan only
1
Stage 1 heating
1
Stage 2 heating
1
Stage 3 heating
Emergency heat
2
Stage 1 cooling
2
Stage 2 cooling
Figure 25: Test Mode Button
Gnd
B-
A+ 24V
P5
Push test button to
enter Test Mode and
speed-up timing and
delays for 20 minutes.
32
Heat Controller, Inc.
P4
(240Vac)
(240Vac)
N.O.
Com
Fan Enable
Fan Speed
Test
P12
N.C.
N.O.
P8
12V
IN
OUT
Gnd
NC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents