Installing the HP ProLiant DL360 G7 Server
No.
2
Examine contents of
shipping container
(Avaya provided
equipment)
3
Verify that the rack is
installed according to
the manufacturer's
instructions and in
accordance with all
local codes and laws
4
Examine installation
environment (customer
provided equipment)
5
Verify that the rack is
grounded in
accordance with local
electrical code.
6
Remove the cabinet
doors, if necessary.
7
Attach the rails to the
rack.
14
Installing the HP DL360 G7 Server
Task
Reference
UG: Contents of the
server shipping carton
UG: Optimum
environment
UG: Electrical grounding
requirements
Comments? infodev@avaya.com
Avaya
recommendation
Ensure that the 6-digit
material code on the
order matches the 6-
digit material code on
the shipping container.
The rails included with
the server will
accommodate most
square-hole racks. If
these rails do not fit the
rack, the customer must
provide rails or a shelf
for rack installation.
Also, the rails included
with the server might
not work with round-
hole racks, in which
case the customer can
obtain rails and/or a
shelf from any
distributor, for example
http://
www.racksolutions.com
/. The customer-
provided rails and rack
must be on site prior to
the first day of
installation.