Board Level 2.5 Repairs - HTC Blackstone Service Manual

Table of Contents

Advertisement

Doc. Title

9.2 Board Level 2.5 Repairs

Basic Repair Instructions for Component Replacement:
Step 1
Place the solder-proof tape to cover the surrounding area of the components which being replaced.
Warning:DO NOT overheat the tape and components to avoid the tape melted and the components damaged
Step 2
Use Heater Gun (HAKO850B, set the temperature between 350°C, Air Speed 3~5) to remove the
components.
Step 3
Wait till the temperature cool down before removing the solder-proof tape to avoid other components
being removed
Step 4
After the damaged or defective components have been replaced; clear the surroundings for solder
and flux residues.
Notice:
A.
Check the polarity and the position of the components, it can't be shifted, reversed or lifted.
B.
All the parts of the PCB should be checked if it is missing or not.
C.
The OP must to wear antistatic wrist strap .Don't put boards together and avoid hitting them.
D.
When you solder and repair that the soldering iron temperature must be setup 415 .
temperature range is 415 ±5 ),and the solder wire's diameter is 0.4/0.5/0.6mm
E.
Please be noticed to follow below steps for main board repair which is equipped with
Capacitor:
1.
When replacing level 2.5 components located around the golden capacitor:
I.
II.
III.
IV.
V.
2.
For BGA replacement: The golden capacitor must be removed before perform pre-heating,
heating, soldering and de-soldering process, and then it must be replaced with a new one
(please refer to 1.c. and 1.d. steps)
3.
For main board which failed to pass the function test, the golden capacitor must be replaced
with a new one and must follow below soldering criteria: The temperature of the soldering iron
must be under 350°c When apply the solder tip to the part / component, the heating time must
be under 5 seconds The solder tip must not have a contact with the body of golden capacitor
HTC CONFIDENTIAL
HTC Corporation
.
Blackstone Service Manual
The temperature of the hot air blower must be under 400°c
When apply the hot air to the part / component, the heating time must be under 20
seconds (including the time of removing and soldering)
The temperature of the soldering iron must be under 350°c
When apply the solder tip to the part / component, the heating time must be under 5
seconds
The solder tip must not contact with the golden capacitor
Doc. No.
DOC-00045694
Issued Date
2008/8/21
Revised Date
2008/11/6
Page
92 of 96
℃ (The
(SAC 305 (1.1%)
SM-TP001-0704
REV.
A01
Golden

Advertisement

Table of Contents
loading

Table of Contents