Daikin FXFQ09PVJU Installation Manual page 20

Vrv system inverter heat pump
Hide thumbs Also See for FXFQ09PVJU:
Table of Contents

Advertisement

10. Use a 90° elbow type of conduit with dimensions Fig. 27-1 to prevent it from hitting the swing motor hous-
ing of decoration panel.
Conduit mounting
plate (17)
Conduit mounting
plate (18)
Power supply and
ground wire
Insulation
tube (16)
Electric insulation
Clamping position
Power supply
Secure the ground wire
and ground
power supply and with
wire sheath
both edges aligned.
Insulation
tube (16)
<<Power supply and ground wire (high voltage)>>
Observe the notes mentioned below when wiring to the terminal block for wiring the units.
English
Conduit mounting
plate (17) (18)
Clamp (4)
Cut off any
L
L
2
1
excess material
after tightening
the power
supply wiring
and ground
Ground terminal
wire together.
Conduit
<1-3/8
≥3/8
Fig. 27-1
Remote
controller wiring
Remote controller wiring
(low voltage)
Approximately
Sheaths
1/4in.
Peel back
the sheath
2-3/4 – 3-1/2in.
on the power
line and twist. Length of
sheath to
peel back
Power supply
terminal block
(3P)
Wiring diagram
(Backside of control box lid)
Fig. 27-2
Transmission
wiring
P1 P2 F1 F2 T1 T2
Forced off
3/8 – 5/8in.
Clamp (4)
Cut off any excess
material after tightening.
Transmission
wiring
Remote
controller
wiring
Wiring
through-holes
Terminal block
for remote
controller
(P1
P2)
Control box lid
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents