Impex MACH IV Owner's Manual page 16

Marcy mach iv home gym
Table of Contents

Advertisement

A.) Attach the Ball-end of the 174" Lower Cable (#43) to the Swivel Frame (#10) on the Main
Base Frame (#1). Install a Pulley (#73) and secure it with a M10 x 1 ¾" Allen Bolt (#105), two
¾" Washers (#127), one L-shaped Bracket (#104), and one M10 Aircraft Nut (#132).
B.) Pull the Cable upward to the Flat Double Floating Pulley Bracket (#37) previously installed in
STEP 9D. Install another Pulley.
C.) Draw the Cable downward to the plate bracket on the Main Base Frame. Install a Pulley.
Then pull the Cable upward to the Single Floating Pulley Bracket (#36) previously installed in
STEP 10E. Install another Pulley.
D.) Pull the Cable downward back to the plate bracket on the Main Base Frame. Install a Pulley.
E.) Draw the Cable along the top surface of the Base Frame towards the front of the machine.
The Cable goes underneath the three Pulleys that were previously installed then through the
opening on the bottom of the Front Vertical Beam (#6). Pull the Cable all the way to the Leg
Developer (#26).
F.) Install a Pulley to the bracket behind the Leg Developer Holder (#25). Insert the end of the
Cable into the opening on the Leg Developer. Align the ring on the Cable to the holes. Secure
it with a M10 x 2 3/8" Allen Bolt (#115), two
(#132).
STEP 12 (See Diagram 13)
A.) Securely tighten all the nuts and bolts previously installed.
3/4" Washers (#127) and a M10 Aircraft Nut
DIAGRAM 12
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Marcy mach iv

Table of Contents