Follett HCC1000A Operation And Service Manual page 21

Hcc/hmc1000a, hcc/hmc1000w ice machines
Table of Contents

Advertisement

6. Orient auger shaft with keyway in the
upward position.
7.
Force main housing into position against evaporator
and place 1/4" (7mm) diameter Phillips screwdriver
into hole in the auger shaft.
8. Replace V-band clamp as shown.
9. Replace nut on V-band clamp and tighten.
10. Remove screwdriver.
11. Reconnect transport tube to louvered
docking assembly.
12. Plug sensor in at the electrical box.
13. Reconnect vent tube to the shuttle housing
as shown.
14. Apply a coat of petrol-gel to the auger shaft.
15. Install gearmotor, making sure that insulation is
properly seated between gearmotor and main
housing as shown.
16. Firmly tighten four gearmotor bolts in place.
Fig. 21
Fig. 22
Fig. 23
Apply petrol-gel
21
Note: Shuttle housing
removed for clarity

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hmc1000Hmc1000aHcc1000Hmc1000wHcc1000wC20000

Table of Contents