Heatcraft Refrigeration Products II Installation & Operating Instructions Manual page 16

Mccu condensing units
Table of Contents

Advertisement

Initial Power On
At the initial application of power to the system, the compressor and the evaporator fans will be in a 4-minute
hold-off cycle and will not start immediately. When there is a call for COOLING, the expansion valve (EEV)
opens, then the compressor is started. The compressor will then run for a minimum of 2 minutes in the "hold-
on" cycle. (This means that the compressor will run for a minimum of 2 minutes before shutting off even if the
box temperature is met).
The LED alternately displays
show while the expansion valve is opening. After the compressor starts, the LED will alternately display
TEMPERATURE
and Coo .
When the room thermostat setting is satisfied, and if the compressor ran for at least 2 minutes, the EEV will
close and the compressor will pumpdown and shut off. The evaporator fans will continue to run. The LED will
alternately display oFF and
When the room sensor detects a rise in temperature of approximately 2°F, and the compressor has been off
for at least 4 minutes, the EEV will open to its last position then the compressor will start. The valve is then
adjusted as necessary to obtain the setpoint superheat setting. During this time, the compressor will run for a
minimum 2 minutes "hold-on" cycle.
The 4 minute "hold-off" can be bypassed and the system started immediately by pressing the "Reset" button
on the Beacon II board.
Figure 14. Operating Mode Display
oFF – Off
Coo – Cooling
Pdn – Pumpdown
dEF – Defrost
drn –
Draining
dLY – Delay
tSt –
Test
SEr – Service
Beacon II Controller
BOX TEMPERATURE
and
BOX TEMPERATURE
.
16
MORE
of operation. On a call for cooling, dLY will
BOX

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H-im-711c5

Table of Contents