Chapter 2 System Safety; Overview; Warnings And Precautions; Preparing For Setup - Supero SC417E16-RJBOD1 User Manual

Sc417j chassis series
Table of Contents

Advertisement

2-1

Overview

This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in order given should enable you to have your chassis set up
and operational within a minimal amount of time. This quick setup assumes that you
are an experienced technician, familiar with common concepts and terminology.
2-2

Warnings and Precautions

You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold that chassis. It should
be situated in a clean, dust-free area that is well venilated. Avoid areas where heat,
electrical noise and eletromagnetic fields are generated.
The system must be placed near at two grounded power outlets. When configured,
the SC417J chassis includes one primary and one redundant power supply.
2-3

Preparing for Setup

The SC417J chassis includes a set of rail assemblies which includes mounting
brackets and mounting screws you will need to install the systems into the rack.
Please read this manual in its entirety before you begin the installation proce-
dure.
Chapter 2
System Safety
2-1
Chapter 2: System Safety

Advertisement

Table of Contents
loading

Table of Contents