Chapter 2 System Safety; Overview; Warnings And Precautions; Preparing For Setup - Supero SC417E16-R1400LPB User Manual

Double-sided storage sc417 chassis series
Table of Contents

Advertisement

2-1

Overview

This chapter provides a quick setup to get your chassis up and running. Following
the steps in order given should enable you to have your chassis set up and opera-
tional within a minimal amount of time. This quick setup assumes that you are an
experienced technician, famailiar with common concepts and terminology.
2-2

Warnings and Precautions

You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold that chassis. It should
be situated in a clean, dust-free area that is well venilated. Avoid areas where heat,
electrical noise and eletromagnetic fields are generated.
Tthe SC417 chassis includes edundant power supplies which require two grounded
outlets.
2-3

Preparing for Setup

The SC417 chassis includes a set of rail assemblies which includes mounting
brackets and the mounting screws you will need to install the system into a rack.
Read this manual in its entirety before you begin the installation procedure.
Chapter 2
System Safety
2-1
Chapter 2: System Safety

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc417e16-r1400ubSc417e26-r1400ubSc417e26-r1400lpb

Table of Contents