Download Print this page

Wall Mount Installation; Cabinet Installation - Thermador HPWB30 Installation Manual

Ventilation hood
Hide thumbs Also See for HPWB30:

Advertisement

Available languages

Available languages

Wall Mount Installation
Note: see below if cabinet installation
is preferred
3. After the hood installation height has been
determined
draw a horizontal
line at a distance
above the cooktop equal to the desired hood
installation height plus 7- 1/2". See also Figure 4a.
4. Find the centerline of the cooktop. Draw a
vertical line along this centerline
up to the hori-
zontal line drawn in step 1 and draw a vertical
line right and left at a distance of 12-5/8" to
determine
the mounting
Iocationofthe
mounting
hooks shipped with the hood.
5. Fit two mounting
hooks on the wall to hang the
hood through
the provided
slots (2 wall
anchors + 2 hooks + 2 screws 5x35).
6. Run 10" Duct, long enough to reach the
transition
once the hood has been installed plus
1 1/2" inch to connect ductwork.
Fix Duct to
transition
with screws and seal withtape.
7. Remove 1 of 2 knockouts and install 1/2"
conduit connector
in j-box.
8. Hang the hood and adjust its position through
the screws on the hooks.
9. Fix the hood to 4 additional
point, 2 on
upperside, 2 on lower side (use 4 wall anchors
+ 4washers + 4 screws 5x35.
Cabinet Installation:
Note: See above if wall mount installation is preferred
Note: Distances on Table 3.3
Find the centerline
of the cabinet bottom.
Draw a line
along this centerline from rear to front of the cabinet.
See also Figure 4b.
4. Draw two lines, one at a K distance from thewall,
the other one at a Z distance from theprevious
line.
Mark 4 points, two along each line at a distance of
halfW from the center line, to determine
the screw
locations.
5. Fit 4 screws on cabinet bottom
do not tighten
completely
but leave a space of about 1/2" from
cabinet bottom
surface and head screws.
6. Run 10" Duct, long enough to reach the transition
once the hood has been installed plus1 1/2" inch for
connect ductwork.
7. Remove 1 of 2 knockouts and install 1/2"conduit
connector
in j-box.
8. Hang the hood on screws through side slots provided
on hood top.Tighten
the four screws. Note: If possible
fix the hood on the wall at 4 additional
point (2 on
upper side, 2 on Iowerside).
9. From the inside of the cabinet attach the transition
on upper outlet.
HOOD WIDTH
DIM. "W"
DIM. "K"
DIM. "Z"
30"
29- I/8"
2- I/2"
7- 1/16"
36"
35-I/16"
2- I/2" 7-I/16"
48"
47- 1/16" 2- I/2" 7- 1/16"
Table 3
Figure 4a
Side slot x 4
Center
Hole
Knockouts
(junction
Z
w
.Top
location
Square
slot
7 1/2' t
bottom
fixing
screws
locations
©
©
wj
K
Hook
for
wall
i
_ Screw
for
/installation
==
cabinet
_'_n
25
,::3/16"
n
_
bottom
_
i
__j__
_'_.
installation
°,,
12
5/8"J
12
5/8"
T
_Adjusting
71/2"
I
"__
screw
Bottom
of the
Hood
Figure 4b

Advertisement

loading

This manual is also suitable for:

Hpwb36Hpwb48