Download Print this page

GE DNCD450GG9WC Installation Instructions Manual page 3

Advertisement

Installation
Instructions
r3] RECONNECTING
GAS
Listed connector
ANSI Z2!.24 / CSA 6.!0
1/8" NPT PIPE
PLUGFOR
NEWMETAL
GAS
FLEXIBLE GAS
INLETPRESSURE
LINECONNECTOR
ADAPTER
SHUT-OFF
3/8" NPT
VALVE
ELBOW
__
PIPESIZE
ITEMSNOT SUPPLIED
AT LEAST1/2"
NOTE:The connector ond fittings (]re designed for use
only on the originol instollotion ond (]re not to be reused
for onother opplionce or ot onother Iocotion. Keep fiore
end of °doptor free of greose, oil ond threod seolont.
CAUTION: Use o doptors
os shown Connector
nuts must not be connected directly to pipe threads.
\
APPLYPIPECOMPOUND
TO THE ADAPTER AND
DRYER GASINLET.
Tighten the flexible
gas line using two
adjustable wrenches.
I
APPLYPIPECOMPOUND
TO ALL MALETHREADS.
Tighten oil connections using two adjustable
wrenches. Do not overtorque gas connections!
14] LEAK TEST
_ZlWARNING-
NEVER USE AN OPEN
FLAME TO TEST FOR GAS LEAKS.
OPEN
GAS VALVE.
Check all connections for leaks with soupy solution or
equivalent. Apply soup solution. Leek test solution must
not contain ammonia which could cause damage to the
brass fittings. If leaks are found, close valve, retighten the
joint, and repeat the soup test.

Advertisement

loading

This manual is also suitable for:

Dncd450ggbwcDmcd330gj2wc