Download Print this page

GE Advantium PSB2200 Installation Instructions Manual page 2

240v built-ln speedcook ovens
Hide thumbs Also See for Advantium PSB2200:

Advertisement

Safetg Information
BEFORE YOU BEGIN
Read these instructions
completely
and carefully.
IM PORTANT- save these i nstructions
for
local inspector's
use.
I M PORTANT-
Observe all governing codes
and ordinances.
• Note to Installer
- Be sure to leave these
instructions
with the Consumen
• Note to Consumer
- Keep these instructions
with gour Owner's Hanual for future reference.
• Skill Level - Installation
of this appliance
requires basic mechanical
and electrical
skills.
• Completion
Time - 1 Hour.
• Proper installation
is the responsibilitg
of the
installer. Product failure due to improper
installation
is not covered under the warrantg.
See Owner's Manual for warrantg
information.
IMPORTANT-
Use this oven onlg for
its intended purpose. Never use the oven for
warming
or heating a room. Prolonged use of the
oven without
proper ventilation
can be hazardous.
CAUTION:
For personal safety, remove house fuse or oven
circuit breaker before beginning installation
to
avoid severe or fatal shock injurg.
CAUTION:
For personal safetg, the mounting
surface must
be capable of supporting
the cabinet load, in
addition
to the added weight of the 80-pound
oven
and 30-pound
drawer, plus additional
oven loads of
up to 50 pounds or a total weight of up to 160
pounds.
CAUTION:
For personalsafetg, this product cannot be
installed in cabinet arrangements
such as an
island, a peninsula or below a countertop.
CONTENTS
Design Information
Models Available ......................................................................
2
Product Dimensions
and Clearances ............................ 3
Tools and Parts Required ....................................................
3
Parts Supplied ..........................................................................
3
Electrical Tools and Parts Required ................................
3
Advance Planning ..................................................................
3
Installation
Preparation
Electrical Requirements ........................................................
/4
Install Junction
Box ................................................................
/4
Preparing the Opening (Installation
without
an accessorg storage drawer) ..................................
5%
Preparing the Opening (Installation
with
an accessorg storage drawer) ..................................
7-8
Installation
Instructions
Step 1, Remove Packaging and Parts .......................... 9
Step 2, Route Conduit ........................................................
10
Step 3, Install Bottom Trim ..............................................
11
Step/4, Install Mounting
Screws ....................................
11
Step 5, Finalize Installation
..............................................
11
MODELS AVAILABLE
Profile Models:
PSB2200NWW-White
PSB2200NBB-Black
PSB2201NSS-Stainless Steel
Monogram
Models:
ZSC2200NWW-White
ZSC2200NBB-Block
ZSC2201NSS-Stainless Steel
Monogram
Pro Range Models:
ZSC2202NSS-Stainless Steel
NOTE: This unit cannot be installed with an
accessorg storage drawer.
2

Advertisement

loading