INSTALLATION INSTRUCTIONS
AFWALL 1.6 GPF FLUSH VALVE
WALL-MOUNTED TOILETS
Model 2254, 2256, 2257, 2258
Meets the American Disabilities Act Guidelines and ANSI A117.1
Requirements for the Physically Challenged
Thank you for selecting American Standard - the benchmark of fine quality for over 100 years. To ensure this
product is installed properly, please read these instructions carefully before you begin. (Certain installations may
require professional help.) Also be sure your installation conforms to local codes.
CAUTION: PRODUCT IS FRAGILE. TWO PEOPLE ARE RECOMMENDED FOR
!
HANDLING TO AVOID BREAKAGE AND POSSIBLE INJURY!
NOTE: For proper operation product requires a minimum of 30 psi working line pressure
RECOMMENDED TOOLS AND MATERIALS
Closet Carrier Support
Putty Knife
Pictures may not exactly define contour of china
1
FINISHED WALL
635mm
(25)
73mm
(2-7/8)
470mm
(18-1/2)
C/L OF SEAT POST
19mm
HOLES 140 mm
(3/4)
(5-1/2) CENTER
98mm
330mm
(3-7/8)
(13)
FINISHED
70mm
(2-3/4)
133mm
(5-1/4)
32mm
(1-1/4)
FOR WALLS UP TO 1" IN THICKNESS FOR EACH INCH
ADDITIONAL THICKNESS OF WALL ADD 25mm (1) TO
MEASUREMENT SHOWN
FINISHED WALL
95mm
(3-3/4)
38mm (1-1/2) DIA. HOLE IN WALL
76mm(3) DIA. HOLE IN WALL
FOR 1-1/2 SPUD
(3/4)
19mm
98mm
(3-7/8)
32mm
(1-1/4)
Refer to instructions supplied with wall carrier for proper installation of 4-bolt support
system wall cavity requirements and rough-in information for waste outlet piping.
P r o d u c t n a m e s l i s t e d h e r e i n a r e t r a d e m a r k s o f A m e r i c a n S t a n d a r d I n c .
© A m e r i c a n S t a n d a r d I n c . 2 0 0 0
Regular Screwdriver
Adjustable Wrench
1" N.P.T. OR C.W.T. SUPPLY
AS REQUIRED TO FLUSH VALVE
C/L
121mm
(4-3/4)
375mm
(14-3/4)
1-1/2 SPUD
(4) 22mm
(7/8)
HOLES
229mm
381mm
(9)
(15)
or
432mm
(17)
C/L OF
FLOOR
OUTLET
1" C.W.T. OR N.P.T. SUPPLY
AS REQ'D NOT FURNISHED
121mm
(4-3/4)
635mm
(25)
470mm
41mm
(18-1/2)
(1-5/8)
C/L OF SEAT POST HOLES
140mm(5-1/2) CENTERS
89mm
(3-1/2)
330mm
(4) 22mm (7/8)
(13)
DIA. HOLES
381mm
(15)
or
432mm
(17)
FINISHED
FLOOR
Sealant
Tape Measure
When installed,
top of seat is
17" to 19"
(432mm to 483mm)
from the finished
floor.
292mm
(11-1/2)
191mm
(7-1/2)
133mm
184mm
or
(5-1/4)
(7-1/4)
254mm
(10)
38mm
C/L
(1-1/2)
298mm
VACUUM BREAKER
(11-3/4)
375mm
(14-3/4)
229mm
191mm
(9)
(7-1/2)
133mm
184mm
C/L OF
or
(5-1/4)
(7-1/4)
OUTLET
Carpenters Level
Flush Valve
2
FIXTURE MOUNTING
Fixture studs should project
1-7/8" (48mm) from face of
finished wall.
Side View
Front View
Saniwares
FINISHED
WALL
1-7/8"
(48mm)
(4) STUDS
730484- 100