Step 5, Install - GE Monogram ZV1050 Installation Instructions Manual

42" island vent hood
Hide thumbs Also See for Monogram ZV1050:
Table of Contents

Advertisement

Installation
Instructions
[STEP 6 SECURE WIRING
• Route
house
wiring
through
the ceiling
hole and
pull a length
to reach
the hood junction
box,
approximately
6" below
the support.
Support _ .
Frames " "-
m
\
\\
/
/
/
/
----___
Celing
_C,
LeftSide
View
\
}Tape
House
Wiring
• Tape
the wire to the left side of the flame
support
to prevent
damage
during
installation
and
service.
STEP 7 SIZE AND INSTALL
DUCTWORK
_/_
Ceiling
:
/
House Duct . ...
Duct C onnection
ToHood ....
i
i
,
/
i
i
.
,
Side
View
Support
Frame
Dim.A
Bottom Support
Frame F lange
:L[__
!
""-' _'",Req
ired
Duct
Duct
Lenth
• Measure
flom
house
duct flange
to bottom
of support
frame
(Dim. A).
- Add at least 1" for duct overlap
at the top.
- Subuact
1-3/4"
for hood
insertion
into
the bottom
of the flame
to determine
required
duct length.
• Cut the 8" duct length
required.
NOTE:
The
bottom
of the duct must
be external
(female)
connection
to the top of the hood.
The
bottom
end
should
be flared
slightly,
to facilitate
installation
of the hood.
• Install
duct up through
support
flames
and attach
to
house
ducfing
with sheet
metal
screws.
• Seal the comlec6on
with duct
tape.
12

Advertisement

Table of Contents
loading

Table of Contents