Download Print this page
GE ZV950 Installation Instructions Manual

GE ZV950 Installation Instructions Manual

36" stainless steel vent hood
Hide thumbs Also See for ZV950:

Advertisement

Installation
Instructions
ZV950
36" Stainless Steel
Vent Hood

Advertisement

loading

Summary of Contents for GE ZV950

  • Page 1 Installation Instructions ZV950 36" Stainless Steel Vent Hood...
  • Page 2 Safer information BEFORE YOU BEGIN WARNING" [] TO REDUCE THE RISK Read these instructions completely and carefully. OF FIRE, ELECTRICAL SHOCK OR INJURY TO PERSONS, OBSERVE THE FOLLOWING: S.ve t hese i .st uctio.s • IMPORTANT- A. Use this unit only in the manner intended by the for local...
  • Page 3 Desi n information CONTENTS Ductwork, Wiring i,ocations ..........Design Information Installation Instructions Product Dimensions Clearances ......1, Install Framing fin Hood Support ...... Optional Accessories ............Step 2, Install Mounting Brackets ........Installation Preparation Step 3, Install Duct Bracket ..........Advance Planning, Step...
  • Page 4 Desi n information PRODUCT DiMENSiONS OPTIONAL ACCESSORIES CLEARANCES (cont.) ZX14SDSS, optional stainless steel duct cover is available for ceiling heights greater than 10 fL Using Duct Cover Accessories up to 14 fL A Duct Cover Accessory be reqtfired for yore Order optional duct...
  • Page 5 installation Preparation ADVANCE PLANNING Ductwork Planning • Use metal duct_,vork. These hoods must 8" round * Determine the exact location of the vent hood. duct. It can transition to 3-1/4" x 12", reducing * Plan the route for venting exhaust to the outdoors.
  • Page 6 installation Preparation Total DUCT FiTTiNGS Equivalent Quantib_ Equivalent Used Duct Piece Dimensions Length* Length straight (per foot Round, length) lft. (per foot 3-1/4" x 12" straight length) this chart to compute maxhnmn permissible lengths duct runs O tltdooYs. 17 ft. 90 °...
  • Page 7 installation Preparation TOOLS AND MATERIALS REQUIRED {NOT SUPPLIEDI . Tapemeasure . Safety glasses Knife . Duct tape Spirit level .Tape to mount template Wire cutter/stripper . Gloves to protect against sharp edges Wire nuts .120V 60Hz. 15 or 20 Amp, 2 wire with ground. Electric drill with 1/8"and 3/8"...
  • Page 8 installation Preparation DUCTWORK, WIRING LOCATIONS CHECK iNSTALLATiON HARDWARE Determine the exact locadon of the vent hood. i,ocate the hardware accessory box packed with the * i,ocate the template packed with the literature. hood check contents. - Measure 36" from the floor to the top of the cooking smfhce.
  • Page 9 installation instructions iNSTALL MOUNTING BRACKETS iNSTALL FRAMING FOR HOOD SUPPORT This vent hood must he secured to the horizontal support or wall studs. • With template taped in place, use a punch i IMPORTANT: of supporting Framing 100 Ibs. must be capable to mark all mounting...
  • Page 10 Installation instructions iNSTALL DUCT BRACKET duct bracket must be installed against ceiling. Pre-Tap I I Pie-Tap This bracket will hold decorative duct cover in place Side ' 'Side Screw Screw at the top. * Install 2 small screws into sides of the duct bracket.
  • Page 11 Installation instructions CONNECT DUCTWORK . Install ductwork, making connections in direction of airflow as illustrated. Duct T ape * Push duct over exhaust outlet until it reaches Over Seam the duct stops. * Secmejoints in ductwork with sheetmetal screws. * Wrap all duct joints with duct rope for an airtight seal. * Use duct tape to seal the flange connection.