IKEA IH6242WM0 Installation Instructions And Use & Care Manual page 8

60 cm (23 3/5") wall-mount canopy range hood
Table of Contents

Advertisement

Available languages

Available languages

Vent Cover Bracket Installation
Installations using telescoping
upper and lower vent cover
assembly
1. Position vent cover bracket on wall about 1/8"(3 mm) away
from the ceiling.
2. Mark the hole locations.
3. Drill 3/8"(9.5 mm) holes for wall anchors and insert anchors
flush with the wall.
,
A
D
A. 10 x 60 mm drywall anchors
B. Centerline on wall
C. Vent cover support bracket
D. 6 x 70 mm screws
4. Attach vent cover support bracket to wall.
Installation
locations
with reduced
ceiling heights
For vented and non-vented
(recirculating) installations,
the vent hood is installed using the upper vent cover
(26" [66.0 cm]) plus a 1/4"(6.4 mm) thick wood filler.
1. For the vent cover to slide down and engage the top of the
hood, the vent cover bracket must be installed 1/4"(6.4 mm)
below the ceiling.
2. The remaining space above the vent cover can be filled with a
1/4"(6.4 mm) thick piece of plywood cut to the inside cross
section of the chimney cover and finished to match the
ceiling.
3. Cut the self adhesive rubber tape supplied with the hood in
4 identical pieces. Attach 2 pieces of tape to each side of the
support bracket.
A
..................................
S
A. Vent cover bracket
B. Rubber tape
Vented Installations
Install transition on top of hood (if removed for shipping) with
2 sheet metal screws.
Non-Vented (recirculating) Installations
1. Install transition on top of hood (if removed for shipping) with
2 sheet metal screws.
2. Attach the vent cover ceiling bracket to the deflector with the
two 3.5 x 9.5 mm screws provided.
B
C
3=
A. Vent cover bracket
B. 3.5 x 9.5 mm screws
C. Deflector
Connect the deflector to the transition with 6" (15.2 cm)
round vent.
Excessive Weight Hazard
Use two or more people to move and install
range hood.
Failure to do so can result in back or other injury.
1. Using 2 or more people, hang range hood on 2 mounting
hooks through the rectangular cutouts on back of hood.
i
DI
B
A. Mounting hooks
B. 5 x 35mm mounting screws
C. Leveling screws
D. Centerline on wall
2. Level the hood with leveling screws in mounting hooks or
rectangular cutouts, using a level across bottom of hood.
3. Secure hood with 4 screws through remaining 4 holes in
hood.
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ih6242sm0

Table of Contents