Liebert GXT2U User Manual page 15

120v, 500-3000va
Hide thumbs Also See for GXT2U:
Table of Contents

Advertisement

5. Prepare the UPS or battery
cabinet (the "equipment") for
rack mounting by following
instructions in the equipment's
user manual. The equipment
may require additional parts to
be added or parts to be removed
for rack mounting. After it is
prepared, lay equipment in
rack-mounting position. Fasten
inner members from Step 2 to
the equipment on both sides as
shown in the figure at right
with (8) M4 screws provided in
this kit. Make sure retaining
latch is near the rear of the equipment (also shown in figure).
6. Open grease packet provided
in this kit. Apply a 1" long
bead of grease four (4) places
inside the bottom, curved
tracks of front members as
shown at right. The grease
will allow the equipment to
slide into the bracket
assemblies more easily.
CAUTION
!
Lifting equipment into rack may be a two-person job, depending
on weight of equipment. See equipment's user manual.
7. Insert the equipment, with inner members attached from Step 5,
into bracket assemblies by inserting top and bottom edges of inner
members into the top and bottom, curved tracks of front members
and sliding the equipment into rack (see figure in Step 6). Ends of
inner members are tapered to allow rear of the equipment to be
angled upward before insertion, if space allows.
Then the rear, bottom edges of inner
members can be placed into front
edge of bottom tracks, and the front of
the equipment can be tipped up into
horizontal position to insert the top
edges of inner members before sliding
the equipment into rack (see figure at
right). The equipment should move smoothly into bracket assem-
blies. If not, recheck alignment of front and rear members from
Steps 3 and 4.
M4
screws
UPS or battery
cabinet
Front
Apply grease
UPS or
battery
cabinet
11
Installation
Retaining
latch
M4
screws
Apply
grease
(inside)
DISCONTINUED
PRODUCT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents