È Fasten the final drive gear case breather hose, speed sensor lead, ground lead, gear position switch lead,
AC magneto lead, wire harness, and reverse indicator light lead with a plastic locking tie. Be careful not to
pinch the breather hose.
É Fasten the leads in the following order: ground lead, reverse switch lead, speed sensor lead, gear position
switch lead, and AC magneto lead.
Ê Pass the final drive gear case breather hose through the hole in air duct assembly 3.
Ë To the rear fender
Ì 70 ~ 90 mm (2.8 ~ 3.5 in)
Í Clamp the thermostat assembly breather hose and carburetor breather hose with the cable guide.
Î Face the coupler release tab upward.
A
B
B
Í
A
È
C
É
Ì
E
E
Î
B - B
2 - 35
CABLE ROUTING
Ê
Ë
D
Ï
C
SPEC
E - E
Ð
D