Assembly; Install Blower Pipes Stick Handle - Echo PB-460LN Operator's Manual

Serial number 02001001 - 02999999
Hide thumbs Also See for PB-460LN:
Table of Contents

Advertisement

10
A
SSEMBLY
WARNING
Never perform maintenance or assembly procedures with engine
running or serious personal injury may result.
INSTALL BLOWER PIPES
1. Assemble straight pipe with swivel (A) into flexible pipe (B).
2. Assemble flexible pipe (B) to elbow (D) on blower.
3. Assemble clamps (C) onto both ends of flexible pipe (B) and
tighten.
NOTE
A light lubricant may be used to ease assembly of flexible pipe to
blower elbow.
4. Loosen wing nut (E) completely and expand stick handle clamp
(F).
5. Align notches (G) in handle clamp with pipe pegs (H). Stick handle
should be angled away from operator.
6. Slide stick handle onto swivel pipe (C).
7. Position stick handle for comfortable operation and tighten wing
nut (E).
8. Assemble straight pipe (J) to swivel pipe (C), turning straight pipe
counter-clockwise to lock in place.
9. Assemble curved pipe (K) to straight pipe (J) turning curved pipe
(K) counter-clockwise to lock in place.
DANGER
/
STICK HANDLE
D
C
B
C
G
H
C
C
A
F
E
J
K

Advertisement

Table of Contents
loading

Table of Contents