Assembly; Install Blower Pipes / Stick Handle - Echo PB-265LN Operator's Manual

Power blower
Hide thumbs Also See for PB-265LN:
Table of Contents

Advertisement

ASSEMBLY

ASSEMBLY
Never perform maintenance or assembly procedures with
engine running or serious personal injury may result.

Install Blower Pipes / Stick Handle

1.
Assemble clamps (A) onto both
ends of flexible pipe (B).
2.
Assemble straight pipe with
swivel (C) into flexible pipe (B).
3.
Assemble flexible pipe (B) to
elbow (D) on blower and tighten
clamps (A).
Note: A light lubricant may be
used to ease assembly of
flexible pipe to blower
elbow.
4.
Loosen wing nut (E) completely
and expand stick handle clamp
(F).
5.
Align notches (G) in handle
clamp with tabs (H).
6.
Slide stick handle onto swivel
pipe (C). Stick handle (F) should
be angled away from operator.
7.
Position stick handle (F) for
comfortable operation. Tighten
wing nut (E).
18
PB-265LN
X7531181900
© 10/23 ECHO Incorporated

Advertisement

Table of Contents
loading

Table of Contents