Connect the long mini-SAS cables.
ii.
Fully install the SFF drive cage, and then secure it by tightening the T-15 screws.
13.
Install the fan cage.
14.
Install the air baffle (on page 26).
15.
For tower models, do the following:
16.
Install the access panel (on page 24).
a.
Return the server to an upright position.
b.
For rack models, do the following:
17.
Install the rack bezel (on page 23).
a.
Install the access panel (on page 24).
b.
Slide the server back into the rack.
c.
Connect each power cord to the server.
18.
Hardware options installation 98