Figure 9 Rotate The Operation And Display Panel; Figure 10 Tower Installation - Liebert GXT3 User Manual

120v/208v 500va-3000va
Hide thumbs Also See for GXT3:
Table of Contents

Advertisement

Figure 9
Rotate the operation and display panel
Operation and Display Panel
Rotated Clockwise 90 Degrees
c.
Pull the logo on the front plastic bezel cover gently, rotate it 90 degrees clockwise and snap it
back into position. The rotated front plastic bezel cover is shown in Figure 10.
d. Replace the front plastic bezel cover on the Liebert
and display panel and logo have been rotated 90 degrees clockwise, which provides upright
viewing for users.
5. Place the Liebert GXT3 and any battery cabinets on the support bases. Each Liebert GXT3 needs
two support assemblies, as shown in Figure 10.

Figure 10 Tower installation

Liebert
GXT3 UPS
®
GXT3
Liebert GXT3
UPS and
External
Battery
Cabinet
Operation and
Display Panel
Rotated for
Tower Operation
Support Bases
13
. At this point, the UPS operation
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents