Testing Under Load; Installation Checklist - Generac Power Systems 004702-0, 004703-0, 004704-0, 004705-0, 004706-0, 004707-0 Owner's Manual

Air-cooled recreational vehicle generators
Hide thumbs Also See for 004702-0, 004703-0, 004704-0, 004705-0, 004706-0, 004707-0:
Table of Contents

Advertisement

7.4

TESTING UNDER LOAD

Apply electrical loads equal to about 75 to 100 per-
cent of the unit's rated wattage/amperage capacity.
Let the unit run at least 30 minutes with load
applied. During this part of the test, check that the
unit is not running excessively hot and that adequate
cooling airflow is available. You must not allow the
unit to overheat during prolonged operation.
The generator engine is equipped with a high tem-
perature switch. The switch has normally open
(N.O.) contacts. When the engine temperature is
too high, switch contacts close, and the engine
shuts down automatically.
GENERAC RECOMMENDS THAT YOU TEST THE
GENERATOR FOR ADEQUATE COOLING.
7.5

INSTALLATION CHECKLIST

LOCATION AND SUPPORT
Generator is properly located.
Generator is properly supported.
Generator is properly restrained.
GENERATOR COMPARTMENT
Compartment construction is proper.
Holes/Openings are vapor-sealed.
Compartment size is correct.
Compartment is vapor-sealed.
Sound insulation is correct.
Floor cutouts are properly completed.
COOLING AND VENTILATING AIR
Airflow is adequate.
Air inlet opening is correct.
Compensate for restrictions.
Check that installation has been tested.
GASOLINE FUEL SYSTEM
Fuel tank complies with all applicable codes.
Fuel system is properly installed and checked
for leaks.
DATE OF INSTALLATION
NAME OF INSTALLER
SIGNATURE OF INSTALLER
QUIETPACT 55, 65, and 75 Recreational Vehicle Generators
NOTE:
____________________________________________________
______________________________________________________
Section 7 – Post Installation
OPTIONAL LP GAS FUEL SYSTEM
Fuel system is properly installed and checked
for leaks.
Pressure at regulator inlet is correct.
Rated flow of primary regulator is correct.
All parts are properly installed.
Fuel system is properly tested/adjusted.
EXHAUST SYSTEM
Exhaust system complies with all applicable
codes.
Exhaust system is properly and safely installed.
ELECTRICAL CONNECTIONS
Connections comply with local code requirements
and all National Electrical Codes.
Junction box is properly installed.
Wiring meets all standards.
All connections are correct.
Conduit is properly installed and sealed.
Generator is properly bonded to the vehicle.
BATTERY INSTALLATION
Recommended battery is installed.
Recommended cables are installed.
Cables are clean and tight.
Cables are connected properly.
Proper ventilation is provided.
Terminals are coated with anti-corrosion grease,
and terminal covers are positioned.
OPTIONAL ACCESSORIES
Check that remote start/stop panels (if used) are
installed properly.
Check that hourmeter kit (if used) is installed
properly.
Check that any other options and accessories (if
used) are installed properly.
POST INSTALLATION TESTS
Check that all tests are completed properly.
________________________________________________
Generac
®
Power Systems, Inc. 35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents