Operation; Procedures For Single Lp 33 Series; Start-Up Of The Lp 33 Series - GE Digital Energy LP 33 Series Operating Manual

50 & 60 kva
Hide thumbs Also See for Digital Energy LP 33 Series:
Table of Contents

Advertisement

7

OPERATION

7.1

PROCEDURES FOR SINGLE LP 33 Series

7.1.1

Start-up of the LP 33 Series

Before connecting hazardous voltages, make sure that:
• The connection to the electrical system has been performed by qualified personnel;
• The equipment frame has been correctly grounded to the main earth;
• Make sure that mains input protection cover is removed;
• All the panels removed to allow the UPS connection have been correctly reinstalled;
• The UPS switches Q1 and Q2 are OFF (Pos. 0);
• The battery Breaker Q3 in Battery cabinet in OFF position.
This procedure must be performed for the first start-up following the installation, with the UPS
completely switched OFF and not powered.
This procedure presupposes that the load is not yet supplied by the UPS system.
NOTE !
The UPS started-up can be done on battery supply in case the input mains is
unavailable.
To avoid an incidental battery discharge, it is recommended to do UPS start-up when
input mains is available.
1.
Switch ON the mains power at the input distribution panel.
As a result the UPS performs a self-test and the LCD will show
the following screen:
NOTE !
In case the alarm "4410 - Mains bypass out of
tolerance" persists, please contact your Service
Center.
2.
Make connection between battery breaker in battery cabinet and battery terminals in UPS in
case of external battery.
Modifications reserved
OPM_LPS_3UO_50K_60K_0US_V010.doc
EXECUTING MAINBOARD
SELF TEST
00000000000
SELF TEST OK!
Continue
Page 35/57
Operating Manual LP 33 Series 50 & 60 kVA

Advertisement

Table of Contents
loading

Table of Contents