Sample Site Inspection Checklist For Site Preparation - HP Integrity Superdome 2 16-socket Service Manual

Hp integrity superdome 2 user service guide
Hide thumbs Also See for Integrity Superdome 2 16-socket:
Table of Contents

Advertisement

You must understand the acoustic noise specifications relative to operator positions within the
computer room when adding HP Integrity Superdome 2 systems to computer rooms with existing
noise sources.
For more information about general site preparation guidelines, see the Generic Site Preparation
Guide.

Sample Site Inspection Checklist for Site Preparation

See
Table 16 (page 30)
progress.
Table 16 Customer and HP Information
Customer Information
Name:
Street address:
State or province:
Zip or postal code:
Primary customer contact:
Secondary customer contact:
Traffic coordinator:
Sales representative
Representative making survey
Scheduled delivery date
Table 17 Site Inspection Checklist
Check either Yes or No. If No, include comment number or date.
Computer Room
Number
Area or condition
1.
Do you have a completed floor plan?
2.
Is adequate space available for maintenance needs? Front 36
inches (91.4 cm) minimum and rear 36 inches (91.4 cm) minimum
are recommended clearances.
3.
Is access to the site or computer room restricted?
4.
Is the computer room structurally complete? Expected date of
completion?
5.
Is a raised floor installed and in good condition? What is the floor
to ceiling height? [7.5 ft (228 cm) minimum]
6.
Is the raised floor adequate for equipment loading?
7.
Are channels or cutouts available for cable routing?
8.
Is a network line available?
9.
Is a telephone line available?
10.
Are customer-supplied peripheral cables and LAN cables available
and of the proper type?
30
System specifications
and
Table 17 (page
30). You can use these tables to measure your
HP information
Phone number:
City or Town:
Country
Phone number:
Phone number:
Phone number:
Order number:
Date:
Yes
No
Comment or Date

Advertisement

Table of Contents
loading

Table of Contents