GE 49-7419-2 Owner's Manual And Installation Instructions page 20

Zoneline vertical heat/cool and heat pump models
Table of Contents

Advertisement

INSTALL AND CONNECT
4
THE CASE
1. Remove the front case panel and pull the unit
out of the case. Place the empty case onto the
platform in the closet with the outdoor side facing
the wall plenum opening. Align the case to the
plenum opening and attach with six screws.
2. Adjust all four leveling legs until the case is level.
Inside
wall
Rigid
ductwork
Air
discharge
outlet
Leveling legs
3. Using field-supplied screws, bolt the case to the
platform.
4. Connect the internal or external drain as necessary.
Drain fitting
Bolt case to
platform
Installation Instructions
"
3
4
External
drain
OR
Internal
drain
INSTALL AND GROUND THE
5a
UNIT TO THE CASE
UNIT INSTALLED THROUGH FRONT
OF CASE
1. Slide the back of the unit into the case. Push the
unit all of the way into the case until it stops.
NOTE: Either of the case sides may be removed to
enable the unit to be slid into the case.
2. Ground the unit to the case by installing the front
case-to-unit hex-bolt and/or case-to-unit side screw.
Side screw
INSTALL AND GROUND THE
5b
UNIT TO THE CASE
UNIT INSTALLED THROUGH SIDE
OF CASE
1. Slide the side of the unit into the case. Push the
unit all of the way into the case until it stops.
NOTE: Either of the case sides may be removed to
enable the unit to be slid into the case.
2. Attach the case side panel to the main case.
3. Ground the unit to the case by installing the front
unit-to-case hex-bolt and/or case-to-unit side screw.
Side screw
(may be
installed on
either side)
20
Hex bolt
Hex bolt

Advertisement

Table of Contents
loading

This manual is also suitable for:

Az75h18eacZoneline 7500 series

Table of Contents