Supplying Power To The Unit; Figure 15. Wallmount Installation - ADTRAN NetVanta 6355 PoE Installation Manual

Hide thumbs Also See for NetVanta 6355 PoE:
Table of Contents

Advertisement

Unit Installation
Step
1
Remove the mounting ears. Rotate them 90 degrees so that the portion of the bracket with the
mounting holes is flush with the bottom of the chassis. Reattach the mounting ears to the
chassis (see
Figure 15 on page
2
Decide on a location for the NetVanta, keeping in mind that the unit needs to be mounted at or
below eye level so that the LEDs are viewable. The NetVanta should be wall mounted with the
front panel facing up (see
3
Prepare the mounting surface by attaching a board (typically plywood, 3/4-inch to 1-inch thick)
to a wall stud using #6 to #10 (2.5-inch or greater in length) wood screws.
Important! Mounting to a stud ensures stability. Using sheetrock anchors may not provide
sufficient long-term stability.
4
Have an assistant hold the unit in position as you install two #6 to #10 (1 inch or greater in
length) wood screws through the unit's brackets and into the mounted board (see
page
38).
5
Proceed to the steps given in

Supplying Power to the Unit

The NetVanta 6355 PoE unit comes equipped with an auto-sensing 100 to 250 VAC, 50/60 Hz power supply for
connecting to a properly grounded power receptacle. (A detachable power cable with a grounded, three-prong
plug comes with the shipment.) To power this unit, connect the power cable to an appropriate AC power source.
38
Instructions for Wall Mounting the NetVanta
38).
Figure 15 on page
Supplying Power to the Unit on page

Figure 15. Wallmount Installation

Copyright © 2011 ADTRAN, Inc.
NetVanta 6355 PoE Hardware Installation Guide
Action
38).
38.
Figure 15 on
61200740E1-34D

Advertisement

Table of Contents
loading

Table of Contents