Maytag W10445417B Use & Care Manual page 17

Table of Contents

Advertisement

3=Wire Direct Wire Connection
Use where local codes permit connecting cabinet-ground
conductor
to neutral wire.
f
"1, Prepare
your 3-wire cable
for direct
connection
Direct wire cable must have 5 ft. (1.52 m) of extra length so
dryer may be moved if needed.
Strip 31/2'' (89 mm) of outer covering from end of cable. Strip
insulation back 1" (25 mm). If using 3-wire cable with ground
wire, cut bare wire even with outer covering. Shape wire ends
into hooks.
2,
Remove
center screw
i
i
Remove
center
terminal
block
screw
(B).
f
3,
Connect
neutral wire
Place hooked
end of neutral wire (white
or center) (D) of direct wire cable under
center terminal
block screw (B), hook
facing right. Squeeze
hooked
end together.
Tighten screw.
r4,
Connect
remaining
wires
Place hooked ends of remaining direct wire cable wires under
outer terminal block screws (hooks facing right). Squeeze hooked
ends together and tighten screws. Replace the terminal block
cover on the back of the dryer. Tighten strain relief nut. Now,
go to" Venting Requirements."
17

Advertisement

Table of Contents
loading

Table of Contents