GE Advantium PSB1200 Installation Instructions Manual
GE Advantium PSB1200 Installation Instructions Manual

GE Advantium PSB1200 Installation Instructions Manual

120v built-ln speedcook ovens
Hide thumbs Also See for Advantium PSB1200:

Advertisement

Quick Links

Installation
I struct"
n
Advantium ® 120V
Built-ln
SpeedCook
Ovens
PSB1200
PSB1201
ZSC1201
ZSC1202
For a Spanish version of this manual, visit our Website at ge.com.
Para cons@tar una version en espaflol de este manual de instrucciones,
visite nuestro sitiode internet ge.com.
i49-40593-!
i
HFL5906090!
12-08
JR

Advertisement

Table of Contents
loading

Summary of Contents for GE Advantium PSB1200

  • Page 1 Advantium ® 120V Built-ln SpeedCook Ovens PSB1200 PSB1201 ZSC1201 ZSC1202 For a Spanish version of this manual, visit our Website at ge.com. Para cons@tar una version en espaflol de este manual de instrucciones, visite nuestro sitiode internet ge.com. i49-40593-! HFL5906090! 12-08...
  • Page 2: Table Of Contents

    Safety Information BEFORE YOU BEGIN CONTENTS Read these instructions completely and carefully. Design Information Models Avoiloble ..............IN PORTANT- Save t hese i nstructions Product Dimensions and Clearances ......3 for local inspector's use. Tools ond Ports Required ............ Ports Supplied ................I M PORTANT-Observe oll governing codes Electricol Tools ond Ports Required ........
  • Page 3: Design Information

    Design Information PRODUCT DIMENSIONS AND CLEARANCES NOTE: Appearance will vary by model. _21-1/2" 29-3/4" 1-1/8" 19" 13/16" 5/8" ADVANCEPLANNING TOOLS AND PARTS REQUIRED • These ovens mag be installed directlg into a 30" wide (NOT SUPPLIED} oven cabinet. • #2 Phillips screwdriver •...
  • Page 4: Installation Preparation

    Installation Preparation ELECTRICAL REQUIREMENTS Single Advantium 120 Installation: This product requires a 120-volt, 60 Hz, 1S-amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency. • Wire size must conform to the requirements of the National Electrical Code or the prevailing...
  • Page 5 Installation Preparation PreparationWITHOUTan AccessoryStorage Drawer PREPARE THE OPENING PREPARE THE OPENING {cont.) The Advantium 120V can be installed in Installation over a GE/Monogram combination with other GE/Monogrom oppliances. Warming Drawer: AlwoLIs follow eoch product's Installotion 23-1/2" Instructions to complete the installation.
  • Page 6: An Accessorg Storage Drawer)

    Per Oven Per Oven Requirement Requirement Min. PerWarming (3" Recommended) Drawer Requirement • If Uou are replacing a GE/IVlonogram electric double oven with the combined installation NOTE: Additional clearances between the cutouts of an Advantium 12OV and a single oven, use may be required.
  • Page 7: An Accessorg Storage Drawer)

    NOTE: Additional clearances between the cutouts • If Uou are mounting an Under-the-Counter GE/IVlonogram oven over another, use the may be required. Check to be sure the oven dimensions shown. The middle rail separating supports above the Warming Drawer location...
  • Page 8 Installation beside another GE/Monogram Built-in Speedcook Oven: • If you are mounting one Under-the-Counter GE/IVlonogram oven beside the other, use the dimensions shown. The middle rail separating the two openings may need to be larger than the a-1/2" minimum shown.
  • Page 9 MODELZSC1202CANNOTBE INSTALLED WITH AN ACCESSORY S TORAGE DRAWER. S EEINSTALLATION PREPARATION W ITHOUT AN ACCESSORY S TORAGE DRAWER FORTHIS MODEL. PREPARE THE OPENING {cont.) PREPARE THE OPENING {cont.) The Advantium 12OV can be installed in Installation over a GE/Monogram combination with other GE/Monogram appliances. Warming Drawer: Always follow each product's Installation 23-1/2"...
  • Page 10 MODELZSC1202CANNOTBE INSTALLED WITH AN ACCESSORY S TORAGE DRAWER. S EEINSTALLATION PREPARATION W ITHOUT AN ACCESSORY S TORAGE DRAWER FORTHIS MODEL. PREPARE THE OPENING {cont.) PREPARE THE OPENING {cont.) Installation over a GE/Nonogram Oven: Installation over a GE/Monogram Oven and Warming Drawer: 30"...
  • Page 11 MODELZSC1202CANNOTBE INSTALLED WITH AN ACCESSORY S TORAGE DRAWER. S EEINSTALLATION PREPARATION W ITHOUT AN ACCESSORY S TORAGE DRAWER FORTHIS MODEL. PREPARE THE OPENING {cont.) PREPARE THE OPENING {cont.) Installation under a GE/Monogram Installation over another GE/Monogram Microwave Oven and over a Warming Under-the-Counter (UTC) oven: Drawer: ....23-1/2" 30"-- 23-1/2"...
  • Page 12 4-1/2" Min. (5-1/2" Recommended) PREPARE THE OPENING {cont.) Installation under a GE Profile 30" or 36" Cooktop or Countertop: Gas or electric cooktops mag be installed over this oven. See cooktop installation instructions for the cutout size. See the Cooktop...
  • Page 13: Installation Instructions

    Installation Instructions REMOVE THE PACKAGING AND PARTS • Remove all packing material and tape. • Locate parts package containing mounting screws. • Remove the oven from the carton. Do not lift unit bg handle or conduit. Two people are required to lift this oven.
  • Page 14 Installation Instructions [_] DOOR TRIM REMOVAL FOR ABOVE SLIDE THE OVEN INTO THE CUTOUT 36" INSTALLATION ONLY CAUTION: Two p eople are required If installing the Advantium 120V Oven above 36" lift the oven into the opening. Grasp the bottom from the floor, you mag remove the plastic trim at front and rear.
  • Page 15: Step 6, Finalize Installation

    Installation Instructions [-4-I INSTALL BOTTOM TRIM INSTALL MOUNTING SCREWS CAUTION: if the A dvantium installing 120V Oven below 36",you must use the plastic CZZZZ3CZZ:] CZZC] CIK13 [ZZZZD CZIZ3 bottom trimdue to burn risk to children. The plastic trimactsas insulation and will help preventburns to children from hot surfaces.
  • Page 16: Models Available

    GE Consumer & Industrial Appliances bl Instructions As e Storage Drawer Advantium ®Built-in Accessory J×2200, J×2201, Z×2201 MODELS AVAILABLE BEFORE YOU BEGIN Profile Models: Read these instructions completely and carefully. Read JX2200BB-BIock the Installation Instructions for the Advantium 120V or...
  • Page 17 UNDER-THE-COUNTER {UTC) MOUNTING BRACKET INSTALLATION NOTE: For UTC models PSB1200, PSB1201 and ZSC1201 onlLl. Open the accessorg drawer so gou have access to the top bracket. Remove the three screws securing the top bracket.
  • Page 18 ASSEMBLY TO ADVANTIUM BUILT-IN SPEEDCOOK OVEN ASSEMBLING THE OVEN TO DRAWER {cont.) Remove the front two bottom screws on each side of the oven and the top center screw on each side of the storage drawer. Place the side supports into the tabs on the drawer and secure using the screws supplied and the screws removed in Step C.
  • Page 19 Notes...
  • Page 20 NOTE: While performing installations described in this book, safety glasses or goggles should be worn. GE Consumer & Industrial NOTE: Product improvement is o continuing endeavor at Appliances General Electric. Therefore, materials, appearance and General Electric Company specifications ore subject to change without notice.

Table of Contents