Download Print this page

Avaya P114T Installation Manual page 11

Stackable workgroup switch

Advertisement

6. Two terminators are supplied with the P110 NMA. Insert the two terminators
into the lowest two connectors at the bottom of the stack, as shown in Figure 2.
7. Turn on the mains power to the stack, by individually switching on each
switch.
8. Connect the fiber-optic cables to the front panel ports.
If the P110 NMA in the stack contains the correct software version (as specified
in the P114T Stackable Switch Release Note) or higher, the stack is now fully
operational.
When a new version of the P110 NMA software becomes available, you should
perform software download to benefit from the extra capabilities provided.
See the P110 NMA Installation Guide for details.
P114T Stackable Switch Installation Guide
Chapter 2
Installation
9

Advertisement

loading