Power On The Server Using The Poweron Command - Fujitsu SPARC Enterprise T5220 Service Manual

Fujitsu server user manual
Hide thumbs Also See for SPARC Enterprise T5220:
Table of Contents

Advertisement

Note – As soon as the power cords are connected, standby power is applied.
Depending on how the firmware is configured, the system might boot at this time.
Related Information
"Power On the Server Using the poweron Command" on page 179
"Power On the Server Using the Front Panel Power Button" on page 180
▼ Power On the Server Using the
poweron Command
Note – If you are powering on the server following an emergency shutdown that
was triggered by the top cover interlock switch, you must use the poweron
command.
Type poweron at the service processor prompt.
-> poweron
You will see an -> Alert message on the system console. This message indicates
that the system is reset. You will also see a message indicating that the VCORE has
been margined up to the value specified in the default .scr file that was
previously configured. For example:
-> start /SYS
Related Information
"Power On the Server Using the Front Panel Power Button" on page 180
Returning the Server to Operation
179

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise t5120

Table of Contents