4. Let the pump cycle until the hydraulic oil temperature
(Figure 29) is approximately 50° to 60° F.
Figure 29. Hydraulic Oil Temperature Gauge
5. The Accumulator Pressure Gauge (Figure 30) should
read approximately 1750 pounds per square inch (psi).
Figure 30. Accumulator
Pressure Gauge
6. Push the Hopper Remixer Control Lever DOWNWARD
(Figure 31). The Hopper Remixer Control lever is located
to the left of the Hydraulic Temperature gauge. Observe
that the blades (Figure 32) inside the hopper are turning
in a clockwise direction (FORWARD). To turn the blades
in a counterclockwise direction (REVERSE), push the
Hopper Remixer Control lever UPWARD (Figure 31).
Figure 31. Hopper Remixer Control Lever
MAYCO LS600 PUMP — OPERATION AND PARTS MANUAL — REV. #4 (9/15/11) — PAGE 29
HYDRAULIC OIL
TEMPERATURE
LS600 PUMP — OPERATION
Figure 32. Hopper Remixer Blades (Rotation)
7. Slide the Volume Control Switch (Figure 27) to the
right to increase the volume to 25-30 strokes per minute.
Slowly discharge the concrete from the ready-mix truck
into the hopper and completely fill it. Keep the pump
running continuously until concrete is discharging at
the end of the delivery system. If the pump is stopped
during this procedure, a blockage may occur.
CAUTION - HOSE/LINE BLOCKAGE
If hoses or lines are blocked for any reason, or if the
lines are kinked when starting up or during the pumping
cycle, the pump pressure could straighten out the kink
or force out the blockage. This rapid surge of material
could cause the lines to whip or move in a manner
that could cause injury to personnel.
8. It is important that once the slurry procedure is
completed, and concrete is flowing through the hose,
DO NOT stop the pour until all the slurry is pumped out
and the concrete has reached the end of the hose. The
only time to stop the pump during the priming procedure
is if a blockage occurs.
9. If it is necessary to replace or add a section of delivery
system, after the initial lubrication procedure, wet the
inside area of the hose, pipe or elbow with 5 gallons of
water per 25 foot length, before adding it to the system.
When pumping long distance or pumping
stiff mixes, you can expect a drop in volume
compared to shorter lines and wetter mixes
due to the change in valve efficiency or
cavitation.