Disposing Of The Packaging; Transporting The Appliance - Vaillant ecoTEC plus SERIES Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

4
Installation
Item
Quantity Description
1
1
Wall bracket
2
1
Boiler
3
1
Lower cover
Supply pipes (gas, heating, expansion relief
4
4
valve)
5
3
Service valves
6
1
Installation template
7
1
Enclosure printed matter
8
3
Bag with small parts
1
Additional for propane boilers: sticker for tank
4.2 Scope of delivery for ecoTEC plus VU boiler
8
7
6
5
4.2 Scope of delivery for ecoTEC plus VUW boiler
Item
Quantity Description
1
1
Wall bracket
2
1
Boiler
3
1
Lower cover
Supply pipes (gas, heating, water, expansion
4
6
relief valve)
5
4
Service valves
6
1
Installation template
7
1
Enclosure printed matter
8
3
Bag with small parts
1
Additional for propane boilers: sticker for tank
4.3 Scope of delivery for ecoTEC plus VUW boiler
14

4.2.3 Disposing of the packaging

> Dispose of the cardboard packaging used on the eco-
TEC plus at a cardboard recycling site.
> Dispose of the plastic film and plastic filling at an appro-
priate plastic recycling site.
> Observe national regulations.
4.3

Transporting the appliance

Important:
With regards to the Manual Handling Operations, 1992 Reg-
1
ulations, the following lift operation exceeds the recom-
mended weight for a one man lift.
General recommendations when handling
2
> Clear the route before attempting the lift.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible. Do not
twist – reposition feet instead.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Avoid upper body/top heavy bending - do not lean
forward/sideways.
> Recommend wear suitable cut resistant gloves with good
3
grip to protect against sharp edges and ensure good
grip.
> Always use assistance if required.
4
Removal of carton from delivery van
Recommend 2 person lift or 1 person with use of sack truck.
> If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
> Recommend secure appliance onto truck with suitable
straps.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Always use assistance if required.
Carriage of carton from point of delivery to point
of installation – ground floor.
Recommend 2 person lift or 1 person with use of sack truck.
> If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
> Recommend secure appliance onto truck with suitable
straps.
> Ensure safe lifting techniques are used – keep back
straight – bend using legs.
> Keep load as close to body as possible.
> If 2 persons performing lift, ensure co-ordinated move-
ments during lift.
> Clear the route before attempting the lift.
Installation and maintenance instructions ecoTEC plus 0020116700_01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents