Honeywell ARENA User Manual page 109

Table of Contents

Advertisement

USER GUIDE
Or,
h. Copy switchpoints from another daily schedule to the new daily schedule as
follows:
i. Right-click on the new daily schedule.
j. Select Copy switchpoints from, then click on daily schedule from which you
want to copy the switchpoint settings, for example, Workday.
The copied settings are reflected on the daily schedule time table on the right.
4. Click Save button on top of the Schedules tree.
This function allows updating a daily schedule by editing the following switchpoint
settings:
• Value
• Start and stop time
• Optimization status
1. In the Schedules tree, expand the tree and click on the daily schedule you want
to update.
2. In the time table, right-click in the switchpoint area (green) and click Update.
The Edit Value dialog box displays.
109
ARENA/ RANGER
Update Daily Schedule / Edit Switchpoint
EN2Z-0906GE51 R0708

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

RangerCentraline arenaCentraline ranger

Table of Contents