Vertical Units, Model BCVC

Install vertical units on the floor. Units are
provided with legs that are field-installed
to help accomodate a U-trap on the drain
connection, if necessary. A field-
fabricated inlet plenum is not required.
The unit is shipped in two pieces, and can
be arranged in either a pre-swirl or
counter-swirl inlet configuration. See
Figure I-IP-4.
24
Installation
Figure I-IP-4. Typical vertical unit installation.
Installation
Procedure