Above roof installation — PV modules horizontal
qU
qE
qW
90°
qT
qQ
qP
In step 2, do not tighten the nuts until after step 3.
Note
Secure the centre clamps between the
last module and the one before it after
the last module has been positioned,
enabling that module to be pushed under
the end clamp.
Installation with mounting brackets
For example, installation on sheet steel
roofs.
2.
2x
qP
1.
qP
Continue with "PV module connection"
on page 41.
Use on-site fixings to secure the brack-
ets (e.g. standing seams).
(cont.)
3.
qP