Changing The Process Connection - YOKOGAWA DpharpEJX vigilantplant EJX110 User Manual

Differential pressure and pressure transmitters
Table of Contents

Advertisement

Vertical pipe mounting
(Process connector downside)
U-bolt nut
Vertical pipe mounting
(Process connector upside)
U-bolt nut
Transmitter
mounting bolt
Figure 4.3
Transmitter Mounting (Vertical Impulse Piping
Type)
Transmitter
mounting bolt
Mounting bracket
U-bolt
50 mm(2-inch) pipe
Mounting bracket
U-bolt
50 mm(2-inch) pipe
F0403.EPS
4.3 Changing the Process Con-
nection
The transmitter is shipped with the process connection
specified at the time of ordering. To change the process
connection,the drain (vent) plug must be repositioned.
To reposition a drain (vent) plug, use a wrench to
slowly and gently unscrew it. Then, remove and
remount it on the opposite side. Wrap sealing tape
around the drain (vent) plug threads (*1 in the figure
below), and apply a lubricant to the threads of the
drain (vent) screw(s) (*2 below). To tighten the drain
(vent) plugs, apply a torque of 34 to 39 N·m {3.5 to 4
kgf·m}. Process connector bolts are to be tightened
uniformly to a torque shown in table 4.1.
Table 4.1 Torque
EJX110A, EJX130A,
Model
EJX310A, EJX430A
Torque(N·m)
{kgf·m}
Vertical impulse piping type
Bolt
Process
connector
Drain/vent plug
Figure 4.4
Changing Process Connection
4-2
4 . INSTALLATION
EJX440A
C capsule D capsule
39 to 49 {4 to 5}
Horizontal impulse piping type
gasket
1
Note: For a horizontal impulse
2
piping type, moving the
process connectors from
the front side to the
back is not allowed.
IM 01C25B01-01E