Top Vent Vertical Venting Runs - Montigo M40DV-CR Installation Operation & Maintenance

Corner gas fireplace
Hide thumbs Also See for M40DV-CR:
Table of Contents

Advertisement

M40DV-CR/CL Corner Gas Fireplace
Installation Of Vertical Vent DV
Vertical Terminations must be installed:
minimum 2' (two feet) above the highest point where
vent passes through the roof.
minimum 6' (six feet) from a mechanical air inlet
minimum 18" (1 1/2 feet) from a parapet wall.
Maximum vent height is 30 feet above fireplace.
Note: Flame characteristics will change if the maximum vent
height is used.
Minimum clearance to combustible construction around the
vent pipe is 1" on all sides must be maintained, except on hori-
zontal venting where the top of the pipe must have a clearance of
at least 2".
A - Termination
B - Flex sections
C - Solid sections
D - Support Ring & Plate
E - Firestop
F - Roof Flashing
Figure 16. Straight, vertical venting.
* If reducing to 4"/7" venting see figure 19.
Page 12
Installation
PVTK-1
PFL-1 (12" section)
PFL-2 (24" section)
PFL-3 (36" section)
PFL-4 (48" section)
PEXT-1 (12" section)
PEXT-2 (24" section)
PEXT-3 (36" section)
PEXT-4 (48" section)
PSPXT-7 (8" dia.)
PS-8 (8" dia.)
PRF-7 (1/12 - 7/12 pitch)
PRF-12 (7/12 - 12/12 pt.)
Top Vent
A maximum of two offsets (each offset has two 90° bends) may be
made if the length of the offsets does not exceed 25% of the vertical
vent height, when measured center to center of piping.
Example:
Typical vent installation.
30' vertical vent
2 - 2' offsets required
25% of 30' = 7-1/2' max. offset allowed
This venting configuration meets requirements.
Figure 17. Vertical venting using 1 offset (1 offset= two 90° bends).
* If reducing to 4"/7" venting see figure 19.
Figure 18. Vertical venting using 2 offsets (1 offset= two 90° bends).
* If reducing to 4"/7" venting see figure 19.
P/N XG0206

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M40dv-cl

Table of Contents