Gas Information; Gas Pressure Requirements; Gas Connection; Access Through The Valve Assembly - Heat & Glo XLR-N-CE Owner's Manual

Installation and operation
Hide thumbs Also See for XLR-N-CE:
Table of Contents

Advertisement

11
Gas Information
A. Gas Pressure Requirements
Pressure requirements for XLR-CE fireplaces are shown
in Table 11.1 below.
Two taps are provided on the right hand side of the gas
control for a test gauge connection to measure the inlet
and outlet pressures.
The fireplace and its individual shut-off valve must be dis-
connected from the gas supply piping system during any
pressure testing of the system at test pressures in excess
of 60 mbar.
If the fireplace must be isolated from the gas supply pip-
ing system by closing an individual shut-off valve, it must
be of the handle-less type.
Fire Risk
Explosion Risk
High pressure will damage valve.
• Disconnect gas supply piping BEFORE
pressure testing gas line at test pressures
above 60 mbar.
• Close the manual shutoff valve BEFORE
pressure testing gas line at test pressures
equal to or less than 60 mbar.
ON/OFF/REMOTE
GAS VALVE
CONTROL
MODULE
Figure 11.1. Valve Components
CAT
Inlet Pressure
Burner Pressure
Gas Rate
Heat Input (Net)
Burner Injector
Pilot Injector
Columns highlighted in gray = The gas control valve supplied with this product is approved for a maximum
inlet pressure of 37 mbar. For pressures over 37 mbar, an in line pressure regulator must be installed
upstream from the gas control valve.
WARNING
SWITCH
BATTERY
DC ADAPTER
Natural Gas
Propane
(G20)
(G31)
I
I
I
I
2H,
2E,
2E+
3P
20 mbar
30 mbar
8.7 mbar
25 mbar
.405
/
.134
/
m3
m3
h
7.32 kW
6.74 kW
DMS 42
DMS .057
51
30
Heat & Glo • XLR-N-CE, XLR-PB-CE • 2198-900 Rev. L • 3/13
B. Gas Connection
Note: Have the gas supply line installed in accordance with
local building codes by a qualified installer approved and/or
licensed as required by the locality.
Note: Before the first firing of the appliance, the gas supply
line should be purged of any trapped air.
Note: Consult local building regulations to properly size the gas
supply line leading to the (Rp 1/2 in.) hook-up at the unit.
Incoming gas line should be piped into the valve compart-
ment and connected to the ISO 7-Rp 1/2 (BSP Rp 1/2)
threaded gas inlet connection on the manual shutoff valve.
Leak test all gas line points and the gas control valve prior
to and after starting the gas appliance.
There is a vent hole on the regulator to equalize the
pressure on the diaphragm. It also a small amount of
air in the top side of diaphragm to keep the pressure
readings more consisent. This not for gas leakage.
PACK
C. Access Through the Valve Assembly
Refer to Section 16.C.
Propane
(G31)
I
3P
50 mbar
25 mbar
.134
/
m3
h
h
6.74 kW
DMS .057
30
WARNING
CHECK FOR GAS LEAKS
Explosion Risk
Fire Risk
Asphyxiation Risk
• Check all fittings and connections.
• Do not use open flame.
• After the gas line installation is complete, all
connections must be tightened and checked
for leaks with a commercially-available, non-
corrosive leak check solution. Be sure to rinse
off all leak check solution following testing.
Fittings and connections may have loosened
during shipping and handling.
Butane
Butane
(G30)
(G30)
I
I
3B/P
3B/P
30 mbar
50 mbar
25 mbar
25 mbar
.111
/
.111
/
m3
m3
h
h
6.44 kW
6.44 kW
DMS 55
DMS 55
30
30
Natural Gas
(G25)
I
2E+
25 mbar
8.7 mbar
.40
/
m3
h
7.32 kW
DMS 42
51
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xlr-pb-ce

Table of Contents