Built-in direct vent fireplace
Hide thumbs Also See for Revolution 36CF:
Table of Contents

Advertisement

Do not route the wires over the top
Junction Box
(not supplied)
Staple the two wires near the junction
box. This prevents the wires from
slipping out of the junction box while
the batteries are replaced. Take care
to prevent damage to wires.
Remote Holder - used to cover the
junction box. It is removed to
replace batteries and access the
learn switch
Battery Box Wire
Wire Length = 12'
of the fireplace.
Battery Box and Learn Switch
(placed inside the junction box)
Remove the Control Box to access the battery box wire. See the
illustration on the following page for wiring details.