Blower Speed; Standard Psc Motor; High Efficiency Ecm Motor; Startup & Adjustments - Nordyne P5RD Series User's Manual & Installation Instructions

P5rd 13 seer series single package air conditioner single stage r-410a
Hide thumbs Also See for P5RD Series:
Table of Contents

Advertisement

2 WIRE
COOLING
THERMOSTAT
...............
/ YELLOW
GREEN
BROWN
CONTROL WIRE LEGEND:
GREEN - Blower Relay
RED - Transformer (24V)
YELLOW - Cooling 1st Stage
BROWN - Heating 1st Stage
ORANGE - Heating 2nd Stage
4 WIRE
HEAT/COOL
THERMOSTAT
Lq--REO
_L_q- YELLOW
I
GREEN
4 --BROWN
ORANGE
Single Stage Electric Heat
REO
--' --q--YELLOW
--I-S_--
GREEN
----I-- BROWN
..........
_
_ORANGE
Two Stage
Heating T-Stat
Figure 9. Low Voltage Connections
Blower Speed
For optimum system performance and comfort, it may be
necessary to change the factory speed setting.
ZLWARNING:
To avoid electric shock, personal
injury, or death,
turn
off the electric
power
at the disconnect
or the main
service
panel
before
making
any
electrical
connections.
Standard PSC Motor
1. Disconnect all electrical power to the unit and remove
the service panel.
2. Place the desired blower speed lead on the COM
terminal of the fan control board. Use another wire tie
(field supplied) to bundle the remaining motor leads.
Hiqh Efficiency ECM Motor
1. Disconnect all electrical power to the unit and remove
the service panel.
CAUTION'.
Label
all wires
prior
to disconnection
when
servicing
controls.
Wiring
errors
can
cause
improper
and
dangerous
operation.
Verify
proper operation
after servicing.
2. Locate the orange and red wires terminated to the blower
motor. The orange wire controls cooling operation and
the red wire controls the heating operation.
CAUTION'.
To avoid
personal
injury or property
damage,
make sure
the motor
leads
cannot
come
into
contact
with any metal components
of the unit.
Thermostat
Wire Gauge
24
22
20
18
Recommended
T-Stat Wire
Length
(Unit to T-Stat)
2-Wire
(Heating)
55
90
140
225
5-Wire
(Heating/Cooling)
25
45
7O
110
Table 2. Thermostat Wire Gauge
3. Verify the required speed from the airflow data found
in Table 3. Place appropriate wire on the appropriate
motor speed tap for the required airflow.
4. Check all factory wiring as shown in the wiring diagram
and inspect the connections to make sure none of them
loosened during shipping or installation.
START UP & ADJUSTMENTS
Pre-Start Checklist
The following check list should be observed
prior to
starting the unit.
_/ Verify the unit is level and allows proper condensate
drainage.
_/ Verify the outdoor coil and top of the unit are free from
obstructions
and debris, and all equipment access/
control panels are in place. Unit must be installed with
the proper clearances as shown on page 5.
_/ Verify that the duct work is sealed to prevent air leakage.
_/ Verify that the line voltage power leads are securely
connected and the unit is properly grounded. Check
the condenser fan to make sure it turns freely.
_/ Verify the thermostat
is wired correctly and installed
in a proper location. Make sure the low voltage wires
are securely connected to the correct leads on the low
voltage terminal strip.
_/ Verify that the power supply branch circuit overcurrent
protection is sized properly.
Start-Up
Procedure
The control circuit consists of an anti-short cycle timer that
will not let the compressor re-start before three minutes
have elapsed.
1. Set the system mode to OFF and the temperature mode
to its highest setting.
2. Turn power on at the disconnect switch.
3. Set the system mode to ON or COOL.
4. Set the temperature
mode below room temperature.
Verify that the
indoor
blower, outdoor
fan,
and
compressor energize and the cooling function starts.
5. Verify the discharge air grilles are adjusted and the
system air is balanced.
6. Verify the duct work has no air leaks.
7. Verify the condensate drain is installed correctly and
functions properly.