Assembly And Setup; Contents Of Carton; Chute Assembly - MTD 31AE6FFF752 Operator's Manual

E/f style
Table of Contents

Advertisement

Assembly & Set-Up
3
Contents of Carton
One Snow Thrower
One Snow Thrower
Operator's
Manual
Two Replacement
Auger Shear Pins
One Tecumseh
Engine Operator's
Manual
One Chute Assembly
One Product
Registration
Card
Assembly
Handle
1.
Place the shift lever in the Forward-6
position
2.
Observe the lower rear area of the snow thrower
to be sure
both cables are aligned
with roller guides before pivoting
the handle
upward.
See Fig. 3-1.
// ....
Figure 3-1
1.
NOTE: Make certain the upper ends of each cable are
seated properly
in its bracket.
Secure the handle by tightening
the plastic knob located
on both the left and right sides of the handle. Remove
and discard any rubber
bands, if present. They are for
packaging
purposes
only.
Chute Assembly
1.
Position the chute assembly
over the base. See Fig. 3-2.
2.
Close the flange keepers to secure the chute assembly
to the chute base. The flange keepers will click into place
when properly
secure. See Fig. 3-3.
NOTE: If the flange
keepers will not easily click into place,
use the palm of your hand to apply swift, firm pressure to
the back of each.
f
Figure
3-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents