Drain Pipe; Preparation Of Chassis - LG LWHD1200HR Owner's Manual

Window-type air conditioner
Hide thumbs Also See for LWHD1200HR:
Table of Contents

Advertisement

installation
NO_
NAME OF PARTS
1
FRAME CURTAIN
2
2
SiLL SUPPORT
2
3
BOLT
2
4
NUT
2
5,
SCREW(TYPE
A)
16
6
SCREW_YPE
B)
3
7
SCREW(TYPE
C)
5
8,
FOAM-STRIP
1
9
FOAM-piE
1
10
DRAIN PiPE
1
11
FOAM-P'E
1
12
FRAME GUIDE
2
13
WIND_J
LOCKING 8RiACKF
1
I
SCREWORiIVER(+,-)_
RLIL_R_ KN_FE_ HAMMER,
PENC|L_ LEVEL
PREPARATION
OF CHASSIS
1, Remove the screws which fasten the cabinet
at both sides and at the back,
2. Slide the unit from the cabinet by gripping the
base pan handle and pulling forward whiie
bracing the _binet.
3. Remove EPS Material,.
,4, Cut the window _sh
seal to the proper
length, Peel off the _cking
and attach the
foam-pe ¢9_ to i the underside
of the window
sash,
5 Remove the backing from the top upper
guide Foam PE @ ,and at_ch
it to the bottom
of the upper guide
6 Attach the upper guide onto the top of the
_binet
with 3,_pe A screws
7_ Inse,_ the frame guides @ into the bottom o#
the cabinet,
& Insert the Frame Cu_ain/_)
_toi the upper
guide and frame guides @.
9. Fasten the curtains to the unit with 4 Type A
screws_
(Type
Upper guide
EPS Material
]
12
Room Air Conditioner
(Type A)

Advertisement

Table of Contents
loading

Table of Contents