Install The Headerbracket - Craftsman 139.53920DM Owner's Manual

1/2 hp 315mhz
Hide thumbs Also See for 139.53920DM:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION
STEP
2
Install the HeaderBracket
You can attach the header bracket either to the wall above the
garage door, or to the ceiling. Follow the instructions which will
work best for your particular requirements. Do not install the
header bracket over drywall. If installing into masonry,use
concreteanchors(not provided),
WALL HEADER BRACKET INSTALLATION
• Center the bracket on the vertical centerline with the bottom
edge of the bracket on the horizontal line as shown (with the
arrow pointing toward the ceiling).
• Mark the vertical set of bracket holes. Drill 3/16" pilot holes and
fasten the bracket securely to a structural support with the
hardware provided.
HARDWARESHOWN ACTUALSIZE
Lag Screw 5/16"-9xl-5/8"
Wall Mount
Optional
MountingHoles
Horizontal
Line
/
/
-; S
Highest Point of
Garage DoorTravel
Vertical
Centerline
of Garage Door
Lag Screws
.
5/16"x9x1-5/8"
Door Spring
--
Garage Door--
Vertical
Centerline
of Garage Door
CEILINGHEADERBRACKET INSTALLATION
• Extend the vertical centerline onto the ceiling as shown.
• Center the bracket on the vertical mark, no more than
6" (15 cm) from the wall. Make sure the arrow is pointing away
from the wall. The bracket can be mounted flush against the
ceiling when clearance is minimal.
• Mark the side holes. Drill 3/16" pilot holes and fasten bracket
securely to a structural support with the hardware provided.
Ceiling Mounting Holes
Header
Bracket
_Finished
Ceiling m
_../_::_
Vertical Centerline
_
of Garage Door
6" (15 cm) Maximum
Door Spring
Lag Screws
5/16"x9x1-5/8"
Header Wall
--
13

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents